|
|
 |
|
|
|

|
|
|
| |
|
|
ACADEMY
AT PALUMBO
HIGH SCHOOL
Philadelphia, PA
|
|
Renovation
of toilet rooms on four floor of the 5-story 185,206 SF building.
Plumbing renovations of existing classrooms into science classrooms
on the 4th floor, including water, gas and compressed air systems.
|
|
|
|
|
|
ALICE
COSTELLO SCHOOL
Cherry Hill, NJ
|
|
Renovation
of three ganged toilet rooms and one private toilet room.
|
|
| |
|
|
|
|
THE
MASK &
WIG CLUB
Philadelphia, PA |
|
Addition
of air conditioning and sprinklers to historic 18th century theater
run by University of Pennsylvania alumni and students. Improvements
include ADA upgrade of toilet rooms, addition of an elevator and
compliant fire alarm system.
|
|
 |
|
PHILADELPHIA
SCHOOL DISTRICT
GEORGE PEPPER
MIDDLE SCHOOL
Philadelphia, PA |
|
Electrical engineering
for the replacement of boilers in both buildings and the addition
of cooling to the George Pepper Middle School. Work is part of the
revitalization of the district infrastructure.
|
|
 |
|
PHILADELPHIA
SCHOOL DISTRICT
SOLIS COHEN
ELEMENTARY
Philadelphia, PA |
|
Electrical and
technology design for a 24,000 SF new kindergarten and 1st grade
primary education building to compliment the existing K-5 adjacent
school.
|
|
 |
|
PHILADELPHIA
SCHOOL DISTRICT
PENROSE ELEMENTARY
Philadelphia,
PA |
|
MEP engineering
for gymnasium addition and facility component improvements. Improvements
will include technology upgrades for classrooms, emergency and exit
lighting and fire alarm replacement. Gymnasium will include MEP/FP
systems for the 11,000 SF addition.
|
|
 |
|
PHILADELPHIA
SCHOOL DISTRICT
MASTBAUM AREA
VOTECH SCHOOL
Philadelphia,
PA
|
|
Technology, fire
alarm and security engineering for the 221,000 SF high school on
6 floors with a basement.
|
|
 |
|
PICKETT
MASTERY CHARTER SCHOOL
Philadelphia, PA |
|
MEP/FP
partial renovation of 1970's school for a Charter School. Entire building
is 175,000 SF with a renovation area of 90,000 SF on three floors
of the existing building. Work to include replacement of air handling
unit chillers, main electrical distribution equipment, lighting, plumbing
fixtures and the addition of sprinklers to the areas being used by
Mastery Charter School. |
|
 |
|
SAMUELS
& SON
SEAFOOD PROCESSING
FACILITY
Philadelphia, PA |
|
MEP/FP
Engineering for new 75,000 SF seafood processing facility, including
10,000 SF sales office, retail sale space. Commercial demonstration
kitchen. Design using LEED guidelines without formal certification. |
|
 |
|
WHOSOEVER
GOSPEL MISSION
Philadelphia,
PA |
|
MEP for
renovation of a historic 1885 building into mens dormitories,
new warehouse, children and womans dormitory with complete
kitchen a dining area and store.
|
|
|
|
|
2773
Philmont Avenue Huntingdon Valley, PA 19006 (215)
947-4562 (ph) (215) 947-6014 (fx) Email
E&M
|
|
|
|
|
 |
 |
|
|
|
|
|
|
|
|
|