ABRAHAM CLARK
HIGH SCHOOL
TEMPORARY TRAILERS
Roselle, NJ
  Electrical design for new service to trailer building as coordinated with PSE&G. Trailer will house the cafeteria overflow seating. Design for interior and exterior lighting. System design to include the expansion of school Paging, Fire Alarm, Phone and Security and CCTV.
AMERICAN BELT
COMPANY
Bensalem, PA
  MEP design for the 9,200 SF addition of office space to the existing 39,100 SF warehouse.
 

BRIDESBURG
ELEMENTARY SCHOOL
Philadelphia, PA

 
MEP/FP design for the $11,500,000 renovation of 36,000 SF existing school and the addition of 40,000 SF LEED Silver Building.
CAMDEN COUNTY
BOARD OF EDUCATION
Camden, NJ
 

Design for sprinkler system in a 9-story historic building to incorporate a rated stairwell. Design includes the creation of corridors to separate and provide for a rated stairwell, new lighting and expansion of the fire alarm system.

CAMDEN COUNTY
GLOUCESTER CAMPUS
Gloucester, NJ
 

HVAC, plumbing, electrical and lighting design for renovation of toilet rooms in Building 1, 2, 4, 5, 6, 8, 10 and 11. Work including plumbing and lighting fixtures and relocation of existing diffusers and ductwork.

CAMDEN COUNTY
TECHNICAL SCHOOL
Pennsauken, NJ
  Toilet room renovation of 9 rooms from locker rooms with open stalls to public toilet rooms with enclosed stalls. Works included plumbing fixtures, piping, exhaust system connections, lighting and fire alarm devices.

CHESTNUT HILL FRIENDS
MEETING HOUSE
Chestnut Hill, PA

 

Feasibility study to add 8,000 SF to existing building or build new on purchased properly.

MAIN LINE ART CENTER  

PROJECT IS ON HOLD UNTIL SPRING 2010 - Mechanical (HVAC, plumbing, and fire protection) and Electrical (power and lighting) Engineering Services for the expansion and renovation of Main Line Art Center Building and Ashbridge Park Historic Barn. Aid owner in submitting for Kresge Foundation grant for energy savings.

MOORESTOWN FRIENDS SCHOOL - GREENLEAF SOUTH ANNEX
Moorestown, NJ
 

Adaptive reuse of 2-story nursing home into classroom building, 14,000 SF. The owner desires a LEED certification for the building for which E&M will participate in a charette, provide basic energy modeling and compliance modeling and basic commissioning. Design includes the reuse of existing geothermal wells with new distribution equipment to suit the classrooms. The building is fully sprinklered and will be reworked for the new spaces. New electric service will be added to accommodate supplemental cooling system, as additional geothermal wells are not within the budget. The building will have all new energy efficient lighting, fire alarm system and power and data for classrooms. Toilet rooms will be reoriented for use of a classroom building.

PHILADELPHIA
INTERNATIONAL AIRPORT
TERMINAL F EXPANSION
Philadelphia, PA
  MEP team member responsible for design of the renovation and 12,000 SF addition to outbound baggage building. Work is part of an overall $100M project including LEED Silver baggage claim building and expansion of concessions, food court, toilet rooms, USAirways Club, and central utilities plant.

PHILADELPHIA
INTERNATIONAL AIRPORT
TAXIWAY LIGHTING
Philadelphia, PA

  Electrical survey and design for replacement of taxiway lighting, directional signage and wiring. E&M was a sub-consultant to Burns Engineering on this 2005 On-Call Contract Replacement of 10" centerline lighting with new standard 12" fixtures. Replacement of degraded signed, faded or in poor condition. Replacement of outdated notification signage to include current FAA regulations. Replacement of wiring along the taxiways in accordance with general maintenance operations.
PHILADELPHIA
WATER DEPARTMENT SOUTHEAST PLANT

Philadelphia, PA
  Electrical engineering for the bar rack replacement project. Work includes survey for demolition and power sources for replacement equipment including the screens, sluice gate actuator and lighting. All work within the bar rack room is to be Class 1, Division 1, Group D for explosive, hazardous locations.
PLYMOUTH MEETING
FRIENDS SCHOOL
Plymouth Meeting, PA
 

HVAC, pluming, electrical and fire protection design for a new approximately 8,000 SF administration building. Design will also show two classrooms.

ROSELLE BOE
EARLY CHILDHOOD
CENTER
Roselle, NJ

  Adaptive reuse of a 21,300 SF call center into a Childcare center. HVAC design to include new ductwork distribution from existing rooftop equipment, addition of ventilation and exhaust systems. Electrical work to include redistribution of existing power, new lighting, fire alarm, technology and emergency lighting. Plumbing to include new fixtures and piping and sprinkler redistribution to suit the layouts .
ROSEVILLE
ADULT DAYCARE
Roselle, PA
  Renovation of 9,000 adult daycare facility. HVAC design for new equipment. Plumbing design for new fixtures and piping and redistribution of sprinklers. Electrical design for power, lighting, fire alarm and emergency systems. Demolition drawings will be provided for removal of existing work.
TEMPLE JUDEA
Doylestown, PA
  PROJECT IS ON HOLD - New 40,000 SF building on a new site. Early Schematic Phase. Projected budget of $4.5M in Phase 1 and $2M in Phase 2.
THURGOOD MARSHALL
ELEMENTARY SCHOOL
Philadelphia, PA
  Evaluation of mechanical systems in relation to LEED for Existing Buildings.
WEST NOTTINGHAM
ACADEMY
Colora, MD
 

PROJECT IS ON HOLD - MEP/FP for 20,000 SF, 2 story Theater and classroom building using LEED guidelines.

2773 Philmont Avenue • Huntingdon Valley, PA 19006 • (215) 947-4562 (ph) • (215) 947-6014 (fx) • Email E&M
Web site and all contents © Copyright YourName 2005, All rights reserved. Free website templates
HOME WHAT'S NEWOUR ENGINEERSFIRM PORTFOLIOON THE BOARDSIN CONSTRUCTIONAWARDS CONTACT US