|
|
 |
|
| |
|

|
|
|
 |
|
|
|
|
| |
|
 |
|
|
|
|
 |
|
|
|
|
BRIDESBURG
ELEMENTARY SCHOOL
Philadelphia, PA |
|
MEP/FP
design for 40,000 SF LEED Silver classroom and cafeteria expansion
of the elementary school including offices, general and special education
classrooms. Smaller addition includes art classroom and music suite.
Renovations to 36,000 SF existing classrooms, offices and gymnasium
building including nursing suite and library (IMC). New and existing
classrooms receive full technology upgrade. |
|
 |
|
|
|
|
 |
|
|
|
|
 |
|
|
|
|
 |
|
|
|
|
 |
|
 |
|
|
CAMBRIDGE
HOPEWELL SPECIAL CARE
Pittsburg, PA
|
|
MEP/FP
design for adaptive reuse of an Assisted Living facility into a Long
Term Pediatric Nursing Care facility. The building is a 35,000 square
foot, 2-story building. Estimated MEP/FP construction cost $1.2 million. |
|
|
|
|
 |
|
| |
|
 |
|
|
CHESTNUT
HILL FRIENDS
MEETING HOUSE
Chestnut Hill, PA
|
|
Feasibility study to add 8,000
SF to existing building or build new on purchased properly.
|
|
 |
|
| MAIN
LINE ART CENTER |
|
PROJECT
IS ON HOLD UNTIL SPRING 2010 -
Mechanical (HVAC, plumbing, and fire protection) and Electrical
(power and lighting) Engineering Services for the expansion and
renovation of Main Line Art Center Building and Ashbridge Park Historic
Barn. Aid owner in submitting for Kresge Foundation grant for energy
savings.
|
|
 |
|
MOORESTOWN
FRIENDS SCHOOL - GREENLEAF SOUTH ANNEX
Moorestown,
NJ |
|
PROJECT
IS ON HOLD - Adaptive
reuse of 2-story nursing home into classroom building, 14,000 SF.
The owner desires a LEED certification for the building for which
E&M will participate in a charette, provide basic energy modeling
and compliance modeling and basic commissioning. Design includes
the reuse of existing geothermal wells with new distribution equipment
to suit the classrooms. The building is fully sprinklered and will
be reworked for the new spaces. New electric service will be added
to accommodate supplemental cooling system, as additional geothermal
wells are not within the budget. The building will have all new
energy efficient lighting, fire alarm system and power and data
for classrooms. Toilet rooms will be reoriented for use of a classroom
building.
|
|
 |
|
PHILADELPHIA
INTERNATIONAL AIRPORT
TERMINAL F EXPANSION
Philadelphia, PA |
|
MEP team member responsible for design of the renovation
and 12,000 SF addition to outbound baggage building. Work is part
of an overall $100M project including LEED Silver baggage claim building
and expansion of concessions, food court, toilet rooms, USAirways
Club, and central utilities plant. |
|
 |
|
|
PHILADELPHIA
WATER DEPARTMENT SOUTHEAST PLANT
Philadelphia,
PA
|
|
Electrical
engineering for the bar rack replacement project. Work includes survey
for demolition and power sources for replacement equipment including
the screens, sluice gate actuator and lighting. All work within the
bar rack room is to be Class 1, Division 1, Group D for explosive,
hazardous locations. |
|
 |
|
PLYMOUTH
MEETING
FRIENDS SCHOOL
Plymouth Meeting, PA |
|
HVAC,
pluming, electrical and fire protection design for a new approximately
8,000 SF administration building. Design will also show two classrooms. |
|
 |
|
ROSEVILLE
ADULT DAYCARE
Roselle, PA |
|
Renovation
of 9,000 adult daycare facility. HVAC design for new equipment.
Plumbing design for new fixtures and piping and redistribution of
sprinklers. Electrical design for power, lighting, fire alarm and
emergency systems. Demolition drawings will be provided for removal
of existing work.
|
|
 |
|
|
SWENSON
ARTS AND TECHNOLOGY
HIGH SCHOOL
Philadelphia, PA
|
|
Electrical
Engineering of a CCTV security system for Swenson Skill Center meeting
current School District standards. Expansion of the existing 16 camera
system. Swenson Skill Center is a 170,000 square foot, 2-story building
used for vocational education including Automotive, Construction,
Plumbing, Electrical, other trades and general education. Estimated
construction cost is $350,000.
|
|
 |
|
TEMPLE JUDEA
Doylestown, PA |
|
PROJECT
IS ON HOLD - New 40,000 SF building
on a new site. Early Schematic Phase. Projected budget of $4.5M in
Phase 1 and $2M in Phase 2. |
|
 |
|
THURGOOD
MARSHALL
ELEMENTARY SCHOOL
Philadelphia, PA |
|
Evaluation
of mechanical systems in relation to LEED for Existing Buildings. |
|
 |
|
WEST
NOTTINGHAM
ACADEMY
Colora, MD |
|
PROJECT
ON HOLD -
MEP/FP for 20,000 SF, 2 story Theater and classroom building using
LEED guidelines.
|
|
 |
|
|
WIDENER
MEMORIAL
SCHOOL
Philadelphia, PA
|
|
Electrical
engineering for the renovation of 30-40 toilet rooms in the 111,000
square foot, 1-story building housing students with disabilities.
Widener Memorial School is the premier site in Philadelphia for
severely handicapped students. Electrically the work includes the
addition of electric lifts, electrically operated changing tables,
automatic door openers and improved exhaust for the toilet rooms.
Fans will be operated by occupancy sensors. Most toilet rooms are
private, being used by the student along with an aid.
|
|
 |
|
WILLINGBORO
HIGH
SCHOOL
Philadelphia, PA |
|
HVAC,
plumbing and electrical design for the Science lab Renovation including
six (6) science labs and three (3) prep areas on the second floor
of the 225,000 square 2-story building. |
|
|
|
|
2773 Philmont Avenue • Huntingdon Valley, PA 19006 • (215)
947-4562 (ph) • (215) 947-6014 (fx) • Email
E&M
|
|
|
|
|
| HOME
WHAT'S NEW OUR
ENGINEERS FIRM
PORTFOLIO ON
THE BOARDS IN
CONSTRUCTION AWARDS
CONTACT
US |
|
 |
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|