|
|
 |
|
|
|

|
|
|
| |
|
ABINGTON
FRIENDS SCHOOL
CAFETERIA EXPANSION
Abington, PA |
|
MEP/FP
for expansion and renovation of cafeteria seating and serving area.
Provide new lighting, power to dishwasher and expansion of fire alarm
system. Provide new gas-fired packaged rooftop rooftop cooling and
heating. Rework kitchen hood make-up air system. Rework existing site
piping outside of new footprint. Extend fire protection system into
expansion area. |
|
 |
|
|
BETH
SHOLOM SYNAGOGUE
VISITOR CENTER
Elkins Park, PA
|
|
Power
and lighting to augment the interactive display chronicling this
Historically Significant Frank Lloyd Wright structure.
|
|
| |
|
|
|
|
|
BRIDESBURG
ELEMENTARY SCHOOL
Philadelphia, PA
|
|
MEP/FP
design for the $11,500,000 renovation of 36,000 SF existing school
and the addition of 40,000 SF LEED Silver Building.
|
|
|
|
|
BRYN
MAWR
PRESBYTERIAN CHURCH
Bryn Mawr, PA |
|
Implementation
of design concepts from study for the replacement of boiler from
steam to hot water serving three buildings. Addition of reheat coils
for dehumidification of sanctuary building.
|
|
 |
|
CHESTNUT
HILL FRIENDS
MEETING HOUSE
Chestnut Hill, PA |
|
Feasibility
study to add 8,000 SF to existing building or build new on purchased
properly.
|
|
 |
|
CHESTNUT
HILL COLLEGE
Chestnut Hill, PA |
|
Renovation of
Greenfield Mansion on the Sugarloaf Campus recently acquired by
Chestnut Hill College. Work will include 40 ton chiller, air handling
units with VFD's, modular boilers, new water service, 100% sprinklering,
new 3 Phase electric service and distribution, new efficient lighting,
generator and fire alarm expansion.
|
|
 |
|
CONGREGATION
BETH CHAIM
Princeton Junction, NJ |
|
Conditions
assessment of existing building with recommendation for improvements.
|
|
 |
|
DREXEL
UNIVERSITY
VIDAS ATHLETIC FIELD
PRESS BOX
Philadelphia, PA |
|
MEP design
for the 1,200 SF Press Box remote to the existing Fieldhouse.
|
|
 |
|
KENNETT
HIGH SCHOOL
Kennett Square, PA |
|
Recommendations
for the replacement of unit ventilators. |
|
 |
|
PHILADELPHIA
INTERNATIONAL AIRPORT
TERMINAL F EXPANSION
Philadelphia, PA |
|
MEP
Team Member for Engineering of the $100M expansion of Terminal F.
Work will include central plant expansion, new food court, gangways,
lounges, toilet rooms and baggage handling. |
|
 |
|
PHILADELPHIA
INTERNATIONAL AIRPORT
TAXIWAY LIGHTING
Philadelphia, PA |
|
Power and lighting
to augment the interactive display chronicling this Historically
Significant Frank Lloyd Wright structure.
|
|
 |
|
|
RITTENHOUSE RESIDENCE
Cinnaminson, NJ
|
|
HVAC
and electrical consulting for heating and air-conditioning modifications
to the existing house and expansion of the kitchen.
|
|
 |
|
SAINT
BEDE THE
VENERABLE CHURCH
Holland, PA |
|
Schematic
MEP design for the addition of 10,000 SF to the building including
the expansion of the altar area and the Narthex. |
|
 |
|
TEMPLE
JUDEA
Doylestown,
PA |
|
New
40,000 SF building on a new site. Early Schematic Phase. Projected
budget of $4.5M in Phase 1 and $2M in Phase 2. |
|
 |
|
WEST
NOTTINGHAM ACADEMY
Colora, MD |
|
MEP/FP
for 20,000 SF, 2 story Theater and classroom building using LEED
guidelines.
|
|
|
|
|
2773
Philmont Avenue Huntingdon Valley, PA 19006 (215)
947-4562 (ph) (215) 947-6014 (fx) Email
E&M
|
|
|
|
|
 |
 |
|
|
|
|
|
|
|
|
|